Internal Control Testing and Deficiency Evaluation
For US SOX 404 and UK Corporate Governance Code Provision 29Live
Adjudicate internal control tests and evaluate control deficiencies under US SOX 404 and the UK Corporate Governance Code, from design and operating effectiveness to severity, aggregation and what must be communicated or declared, with the standard's own paragraph cited for every determination. Run it live here →
Raelog model · Internal Control Testing and Deficiency Evaluation
A financial-reporting control at a SOX 404 listed issuer, assessed by management, carries an operating deficiency whose potential misstatement is material and reasonably possible.
One MCP call injects the framework, the control's scope, regime, materiality band and assessor, and the deficiency's type, magnitude band and likelihood: 11 facts.
Every control under test ends in one determination at each decision point, with the paragraph of the standard it rests on.
This is a reference model for internal control testing in banks reporting under US SOX 404, including institutions caught by FDICIA Part 363 whether listed or not, and under the UK Corporate Governance Code 2024, Provision 29. The method is the graph and each bank's control inventory is data supplied at query time: given one control, its design attributes, its test results and any deficiency recorded against it, the agent decides whether the control is designed effectively, whether it operated effectively over the period, including sample sufficiency, evidence quality, roll-forward and reliance on IT general controls and entity-produced information, and how severe any deficiency is, aggregated across related deficiencies. A single framework fact selects the overlay: under SOX 404 the determination is deficiency, significant deficiency or material weakness with the AS 2201 communication route; under Provision 29 it is whether a material control operated effectively at the balance sheet date and what the board's declaration must say. The two vocabularies never blend, every determination names the paragraph it rests on, and an incomplete record produces a question, never a guess.
Grounded in SEC Release 33-8810, PCAOB AS 2201 and AS 2315, FDICIA Part 363, the UK Corporate Governance Code 2024 with the FRC's guidance, ISA (UK) 265, 315 and 330, and COSO 2013: 865 rules each carrying its scope tag and source paragraph, 49 calibration parameters such as sample sizes, roll-forward gaps, remediation periods and the severity grid held as data rather than rules, and 91 tests passing at full certainty.
This model and its accompanying documentation have been constructed from publicly available legislation, regulatory guidance and published research. It is made available for demonstration and evaluation purposes and you are free to download it and adapt it to your own policy.
14 October 2026
81 acceptance tests and 10 red-team regression tests spanning design assessment, the sample-size grid, operating effectiveness, the nine-cell US severity grid, every communication route, aggregation, compensating controls, the UK declaration and the international classification, all 91 passing at full certainty with no interview questions.
The graph returns twenty named determinations across its three decision points and two overlays. The seven shown span all of them; the US and UK top-severity terms never appear in the same answer.
See this accelerator in action.
We’ve built a demonstration workbench with ten controls every bank runs, from a suspense account reconciliation to fair value price verification, each framed for US SOX 404 and for UK Provision 29 with a toggle between them.
Run one, or run the queue, and each control is put to the live Raelog agent and comes back with its design assessment, its operating effectiveness conclusion, the severity of any deficiency or the consequence for the board’s declaration, what must be communicated and to whom, and the paragraph of the standard behind each. Flip the framework on the same facts and watch the vocabulary change without a rule changing.
Open the evidence tree on any result and walk every step the engine took, down to the control fact each one rests on.
The controls, institutions and figures are fictitious and for evaluation only.
Download the accelerator and try it yourself.
Download the model, load it into your free Rae account, query it from an agent, then pivot it to your methodology.
One file, with everything below inside it.
Import it into Rae to open the model, tests and documentation as a project.
- Raelog modelRaelog XML · 865 rules
- Rae test suite91 tests, engine-exact
- Solution documentationMarkdown
- Regulatory cross-referenceMarkdown
- MCP connection guideGenerated on import
- MIT licenceMarkdown
internal-control-testing.rake
Version 1 · verified 14 October 2026
This accelerator is open source under the MIT licence. The model, test suite and documentation are free to download, inspect, adapt, redistribute and use, commercially included, provided the licence notice travels with them. They encode public regulation, guidance and research and are offered for demonstration and evaluation, not as legal, regulatory or audit advice: calibrate the parameters to your own methodology and validate the determinations against your own cases before relying on them.
Run this decision against your own cases
Contact us to discuss your decision use case.
